Analysis of The Implementation of The Excavation Work of Blasting Stone in The Quarry For Rockfill Pile of The Beringin Sila Dam Construction Work Project Package-1 Sumbawa Regency, NTB.

Authors

  • Ikhwan Sholihuddin Faculty of Engineering and Computer Science Departement of Civil Engineering Narotama University Surabaya
  • Adi Prawito Faculty of Engineering and Computer Science Departement of Civil Engineering Narotama University Surabaya

Keywords:

Blasting, Cost Analysis, Heavy Equipment, Time Analysis

Abstract

Embankment dams based on the grain size of the embankment material used are divided into 2 types, namely rock filled dams and earth fill dams. The Beringin Sila Dam is a random and rock fill dam with an upright core which is in the process of being built by stockpiling materials such as stone, gravel, clay, and soil. Blasting is an activity of breaking up a material (rock) using explosives or the process of an explosion, in blasting one of the important things that must be considered is the fragmentation of rock resulting from blasting.

The method is carried out by observing the realization in the field and analyzing project data. The purpose of this study was to determine the productivity of heavy equipment, to analyze the realization costs of excavation and heap of blasted rock at the quarry location.

The results of this study indicate that the productivity of drilling tools for drilling tools, with the Crawler Rock Drill (CRD) tool, it gets 5 holes/hour, while with the Hydraulic Crawler Drill (HCR) it gets 4 holes/hour. Productivity of loading and unloading equipment on excavation work and blasting heaps of rock at the quarry location, with an average of 25 units of transportation equipment and 4 units of CAT 330 excavator as loading equipment. For loading equipment, the production yield is 41.40 m3/hour, while for transportation equipment the production yield is 6.62 m3/hour. The realization cost for excavation work and rock heap from blasting at the quarry location in July – September required a cost of Rp.11,124,373,500.00 including the cost of wages, materials, and tools.

Downloads

Download data is not yet available.

References

Anugrah, J. 2019. “Analysis of Maindam Embankment Work in South Kalimantan Tapin Dam Development Project, Research. South Kalimantan.”

Fathoni, R. 2015. “Productivity of Loading Equipment and Transport Equipment in Coal Getting Pit 3 Activities at PT Sarolangun Bara Prima, Mandiangin District, Sarolangun Regency, Jambi Province, Final Project. University.”

Hasibuan, MN. 2019. “Evaluation of the Implementation of Soil Excavation Work on the Left Backrest of the Dam Body in the Beringin Sila Dam Development Project (Package 1), Research, Sumbawa?: PT. Brantas Abipraya (Persero).”

I, Nusa Tenggara River Basin. 2018. “Technical Specifications for the Construction of the Beringin Sila Dam in Sumbawa Regency.”

Koesnaryo. 1988. “Explosives and Blasting Methods. Journal of the Faculty of Mines, Yogyakarta ‘Veteran’ National Development University.”

Lexy J. Moleong. 2018. Metodologi Penelitian Kualitatif / Penulis. Edisi revi. Bandung: PT Remaja Rosdakarya.

Nugraha, D. 2018. “Analysis of Costs and Productivity of Heavy Equipment Use in the Construction Activity of the Pekanbaru IV Siak Access Road, Final Project. Riau?: University of Riau.”

Rachmayanti, ND. 2017. “Implementation Method, Cost Efficiency And Time Of Rock Excavation Work With The Blasting Method In The Bendo Ponorogo Reservoir Construction Project, Final Project. Yogyakarta?: Gadjah Mada University.”

Suryaputra, A. 2009. “Technical Study on Production of Loading Equipment and Transport Equipment in Overburden Stripping Activities of PT. Marunda Grahamineral in Laung Tuhup District, Murung Raya Regency, Central Kalimantan, Final Project. Yogyakarta?: National Development Un.”

Suyono Sosrodarsono, Kensaku Takeda. 1981. Bendungan Type Urugan. Cet. 3. Jakarta?: Pradnya Paramita.

Syauki, IA. 2018. “Analysis of the Cost of Heavy Equipment Usage in the Pariaman City – Manggopoh Boundary Road Reconstruction Project, Padang Pariaman Regency, West Sumatra Province, Final Project. Riau?: University of Riau.”