Analysis of The Causes of Delay Completion of Development Projects Workshop Facility - Bekb, Melak, East Kalimantan

Authors

  • Hamonangan Girsang Faculty of Engineering, Mercu Buana University
  • Refianda Eki Putra Faculty of Civil Engineering, Mercu Buana University Jakarta
  • Irriene Indah Susanti Faculty of Civil Engineering, Mercu Buana University Jakarta
  • Yopi Lutfiansyah Faculty of Civil Engineering, Mercu Buana University Jakarta

Keywords:

BEKB Facility Workshop, Construction Projects, Project Delay Factors, SPSS

Abstract

Construction projects often suffer from poor performance in terms of execution time management. This is a problem that must be taken seriously. When a delay occurs in a project, there will be additional costs that must be incurred outside the contract and can cause losses for the parties involved, especially the construction contractor. Therefore, it is necessary to pay more attention to the delay in implementation time. The research method used in this research is descriptive quantitative by determining the research variables based on previous journals. Supported by the distribution of phase 1 questionnaires and phase 2 questionnaires which were distributed to 40 respondents related to the Facility Workshop development project located in Melak, East Kalimantan. The questionnaire analysis was assisted by the SPSS version 25 program. The analyzes used were Validity Test, Reality Test, Descriptive Statistical Analysis, Normality Test, Multiple Regression Test, T Test and F Test. From this study, the factors causing delays based on descriptive statistical analysis that meet the requirements of the T-test are material factors (X1), with the indicator "Incorrect material delivery schedule (X1.2)" then supported by the results of multiple linear regression analysis with coefficient positive regression, meaning that there is a significant effect between variables and project delays.

Downloads

Download data is not yet available.

References

Ahmad Ridwan, Rekso Ajiono. 2017. “Pengendalian Biaya Dan Jadual Terpadu Pada Proyek Konstruksi.” Jurnal Ilmiah Teknik Sipil 12(2): 74–83.

Aulady, Mohamad et al. 2016. “Perbandingan Durasi Waktu Proyek Konstruksi AntaraMetode CriticalPathMethod (CPM) Dengan Metode Critical Chain Project Management (Studi Kasus: Proyek Pembangunan Apartamen Menara Rungkut).” Jurnal IPTEK 20(1): 13–24. http://ejurnal.itats.ac.id/iptek/article/view/29 (July 19, 2022).

Christopher Triarman, Jane Sekarsari. 2018. “Analisis Faktor Penyebab Keterlambatan Waktu Pada Pekerjaan Struktur Atas Proyek Konstruksi.” Jurnal Penelitian dan Karya Ilmiah Lembaga Penelitian Universitas Trisakti: 1–9. https://scholar.google.com/citations?view_op=view_citation&hl=id&user=267GefgAAAAJ&citation_for_view=267GefgAAAAJ:eQOLeE2rZwMC (July 19, 2022).

Hassan, Haekal, Jantje B Mangare, and Pingkan A K Pratasis. 2016. “Faktor–Faktor Penyebab Keterlambatan Pada Proyek Konstruksi Dan Alternatif Penyelesaiannya (Studi Kasus?: Di Manado Town Square Iii).” Jurnal Sipil Statik 4(11): 657–644.

Kurniawan, Fredy et al. 2018. “Studi Kasus Keterlambatan Proyek Konstruksi Di Provinsi Jawa Timur Berdasarkan Kontrak Kerja.” Narotama Jurnal Teknik Sipil 2(2): 21–31. https://jurnal.narotama.ac.id/index.php/njts/article/view/698 (July 19, 2022).

P.K. Venkatesh, V. Venkatesan. 2017. “Delays in Construction Projects: A Review of Causes, Need and Scope for Further Research.” : 89–113. https://www.researchgate.net/publication/326467540_Delays_in_construction_projects_A_review_of_causes_need_and_scope_for_further_research (July 19, 2022).

Palulun, Yohanes Ranjed, Pingkan A. K. Pratasis, and Jantje B Mangare. 2017. “Analisis Faktor-Faktor Yang Berpengaruh Terhadap Keterlambatan Pada Proyek Jalan Di (Provinsi Sulawesi Utara).” Jurnal Sipil Statik 5(7): 451–64. https://ejournal.unsrat.ac.id/index.php/jss/article/view/17633.

Prof.DR. Sugiyono. 2013. Metode Penelitian Pendidikan Pendekatan Kuantitatif, Kualitatif Dan R&D | Perpustakaan Universitas Gresik. bandung: Alfabeta. https://digilib.unigres.ac.id/index.php?p=show_detail&id=43 (July 19, 2022).

Putra Agritama, Randy, Miftahul Huda, and Titien Setiyo Rini. 2018. “Faktor-Faktor Yang Mempengaruhi Keterlambatan Proyek Konstruksi Di Surabaya.” Jurnal Rekayasa dan Manajemen Konstruksi 6(1): 25–32.